Loading Events

« All Events

  • This event has passed.

Designing Linear Infrastructure in a Karst Environment: Case Study N17 N18 Gort to Tuam PPP

January 16, 2017 @ 6:30 pm

IAH-Geotechnical Society of Ireland Event

Designing Linear Infrastructure in a Karst Environment: Case Study N17 N18 Gort to Tuam PPP

Monday 16th January 2017
From 6:30pm in Engineers Ireland, 22 Clyde Road, Dublin 4

This free presentation is hosted by the Geotechnical Society of Ireland.  Our panel of speakers from Arup will discuss the challenges posed by the karst environment of the 60km Gort to Tuam N17/N18 PPP design and build scheme. During the course of the presentation, they will outline some of the solutions to the drainage issues and the identification of high risk areas and associated threats to the pavement and bridges.

http://www.engineersireland.ie/groups/societies/geotechnical-society/events/joint-gsi-iah-lecture.aspx

Details

Date:
January 16, 2017
Time:
6:30 pm
Event Category:

Venue

Engineers Ireland, Ballsbridge, Dublin
Clyde Road, Ballsbridge
Dublin, Ireland
+ Google Map

Details

Date:
January 16, 2017
Time:
6:30 pm
Event Category:

Venue

Engineers Ireland, Ballsbridge, Dublin
Clyde Road, Ballsbridge
Dublin, Ireland
+ Google Map